Non-Process Infrastructure

Tropicana Gold Mine Project

The Scope of Work within the Treatment Plant Site includes construction of earthwork building pads, detailed earthworks and concrete installation of the Ball Mill Foundation & Pedestal and the Flotation Cell Foundations & Ring Beams within the Treatment Plant Site Area. Dry Area includes – Primary Crusher – construction all structural steel cast-ins. Reclaim Tunnel […]

Jimblebar Ammonium Nitrate Storage Facility

Centrals were subcontracted to perform the Civil Earthworks and Concrete works to the Jimblebar Ammonium Nitrate Storage Building, HE Detonator & Magazine Facility, Diesel / Emulsion Storage Facility, and Transportable Offices which includes; Set up Pre-cast concrete fabrication area. On site manufacturer & installation of precast tilt up wall panels for multi-levelled AN Building. Construction of […]

Cawse Nickel Acid Bund Upgrade

Removal and reinstallation of acid proof linings to the sulphuric acid loading facility and process thank facilities. Stripping of flexible linings from steel process tanks and installation of acid and abrasion protective linings.

AN Storage Facility Concrete Remediation & Coating

The Ammonium Nitrate (AN) Storage Bunkers and 30t Hopper have experienced degradation of the concrete slabs and walls caused by an adverse chemical reaction between the Ammonium Nitrate and the concrete. This has affected approximately 40% of the concrete floors and a small portion of the walls, exposing the top layer of concrete in the […]

Sino Iron NPI Buildings

Design and construction of the main workshop complex at the Sino Iron Port Facilities including modular, transportable administration and amenities buildings, road works, infrastructure and underground services.

Roy Hill NPI

Engaged by Brookfield Multiplex, Centrals scope included the complete civil works associated with the Non Processing Infrastructure located at Roy Hill Mine Site. These areas included the Boilermaker Workshop, HV/ LV Workshop, HV and LV Wash-down Facility, Tyre Change Facilities, Bulk Lube Farm, Go-line Buildings, Administration Buildings and other smaller stores and facilities. Total building area under construction is 20,823 […]