Concrete Repair & Steel Reinforcement
Project Scope
Central Systems has recenty been awarded a package for the repair of concrete to Berth 4 on the Geraldton Port Facility. Scope of works includes hydro-demolition, reinforcing steel repair/preparation, soffit formwork design and installation and reinstatement of conrete on the berth.
Due to the concurrent operational requirements of the Gerald Port Authority (GPA), the project must be commenced in small multiple sections of the berth to ensure there is no affect on ship loading operations. This requires a highly experienced team of multi-skilled concretors to be capable of moving efficiently between different work platforms while minisming production loss, in order to meet GPA requirements.
CLIENT & LOCATION: Geraldton Port Authority, Geraldton, Western Australia
CONTRACT VALUE: AUD$0.5M
DURATION: 3 Months
COMPLETION: June 2011